Bismarck Daily Bismarck Daily Bismarck Daily
    • Home
    • Advertise
    • About us
    • Meet the Team
    • Privacy Policy
    • Terms and Conditions
    25 Jul 2025
    • Bismarck Daily Bismarck Daily Bismarck Daily
    • Local News
    • State News
    • Politics
    • Crime News
    • Coronavirus
    • Sports
    • Community
    • About us
    • Privacy Policy
    Broadway Bridge project wins Gold Star award for concrete work
    Politics

    Broadway Bridge project wins Gold Star award for concrete work

    Ally Dillinger, 5 years ago
    MINOT, N.D. – The Broadway Bridge replacement project was recently named the 2019 Gold Star winner for excellence in concrete in the bridge category at the Ready Mix & Concrete Products Association’s annual convention.

    The City of Minot, in conjunction with the North Dakota Department of Transportation, replaced the aging bridge structure, which was built in 1962, and expanded the bridge to two lanes of northbound and two lanes of southbound traffic in 1971. Lunda Construction was the general contractor, with Strata Corp. as the concrete supplier. Strata also performed the concrete work for the new roadway. The project engineering firms were Burns & McDonnell and Bartlett & West.

    “The Broadway Bridge runs through the heart of our city and is vital to the everyday lives of our community’s residents,” said Minot City Engineer Lance Meyer. “We’re proud of the work done by our staff, the North Dakota Department of Transportation, and all the contractors and subcontractors, including Strata Corporation, which supplied the concrete for this project. It was a total team effort to rebuild this critical piece of our city’s infrastructure.”

    The bridge was built in two phases over two years. Approximately 8,500 cubic yards of concrete were produced for the project. The project included incorporating a portion of flood wall that is being constructed as part of the Mouse River Enhanced Flood Protection Plan. The new structure is 86 feet wide with a length of 822 feet. The bridge carries about 30,000 vehicles daily.

    The 2021 Ready Mix & Concrete Products Association annual convention is scheduled to be held in Minot.

    Politics

    City of Minot will appeal FEMA’s preliminary flood map

    Politics

    Broadway Bridge project wins Gold Star award for concrete work

    Related posts

    Politics

    City plans to lift in-house mask requirements

    Ally Dillinger, 4 years ago
    Politics

    Minot’s Few Still “On The Fence” With Masks.

    Ally Dillinger, 5 years ago
    Politics

    Ignoring the present doesn’t change the necessity of oil

    Ally Dillinger, 5 years ago
    Politics

    Restraining order denied over salon at Minot assisted living facility

    Ally Dillinger, 5 years ago
    Politics

    North Dakota Governor Opens Positions for Applications

    Ally Dillinger, 4 years ago
    Politics

    Minot Public Works, Engineering won’t move to new city hall

    Ally Dillinger, 4 years ago

    Follow us on Google News

    Follow us on Flipboard

    Trending Slider

    Bismarck Public Library to host one-hour game and puzzle flash sale on August 5
    2 days ago
    North Dakota expands public alert system with new alerts for missing endangered adults
    2 days ago
    Traffic signal repairs to cause lane reductions at Washington Street and Avenue C
    2 days ago
    Bismarck names new police chief following unanimous commission vote
    2 days ago
    Two seriously injured in rollover crash south of Valley City as driver faces felony charge
    2 days ago
    Progress continues on East Century Avenue project in Bismarck
    2 days ago

    Follow us on News Break

    Categories

    • Bismarck (1)
    • Community (595)
    • Coronavirus (232)
    • Crime News (278)
    • Local News (552)
    • News (15)
    • Politics (260)
    • Sports (215)
    • State News (453)
    • Trending (335)
    • Uncategorized (1)
    • Login
    • Register

    Forgot Password

    Registration is closed.